Bathroom model pt. VI

by | Mar 10, 2011 | House

Our cabinet was delayed a week so we’re hoping to have it installed next week. In the meantime we had a sun tunnel and molding installed, plus the walls painted (‘Balmy’ by Sherwin Williams).

sun tunnel

the new sun tunnel makes quite a difference

we have a door

we have door!

molding and paint

paint and trim

granite sample

a sample of the granite against the paint

Tagged with: House | renovation

Our Itinerary

2025 Trips

Buenos Aires, Argentina (Feb)
Bariloche, Argentina (Feb)
Iguazu Falls, Argentina (Feb)
Boston, MA (Apr)
Kathmandu, Nepal (May)
Bhutan (May)

2024 Trips

San Diego, CA (Jan)
Sarasota, FL (Feb)
Madrid, Spain (Mar)
Valencia, Spain (Mar+Apr)
Palma, Mallorca (Apr)
Croatia (May)
Long Island, NY (July)
Faroe Islands (Aug)
London, UK (Sept)
Puglia, Italy (Sept)
Matera, Italy (Oct)
Rome, Italy (Oct)
Mosel Valley, Germany (Oct)
Frankfurt, Germany (Oct)
London, UK (Dec)
Manchester, UK (Dec)

2022 Trips

Florida (Feb)
NC Mountains (Apr)
Washington DC (Apr)
Valencia, Spain (May)
Hilton Head, SC (May)
Pacific NW (Jun)
Long Island (Jul)
Florida (Sept)
Chicago (Sept)
Poland (Sept)
NC Mountains (Nov)
Euro Xmas Markets (Dec)