first floor renovations, part VI

by | Nov 23, 2011 | House

I finished the backsplash Sunday night, and Monday morning the cabinet painter came to take all the doors and tape off the kitchen.

before cabinet painting begins...
a total mess but at least my cabinets look organized!

letting the cabinets dry...
after a coat of primer and two coats of semi-gloss white paint

The doors were sprayed back in his shop, but the base cabinets and drawers were painted on-site. Though the primer/paint fumes were strong we were lucky that the weather was nice enough to have open windows for most of the week. The mess also made cooking a tad bit difficult but at least it only took a week.

kitchen cabinets (after 3 coats)
almost done – it already looked much brighter

On Friday all the doors were re-hinged and re-hung and on Saturday he finished installing the new drawer pulls and handles.

new kitchen - from the side entrance
the finished product!

new kicthen - closeup
light and bright

We absolutely love the rejuvenated cabinets and the room finally looks like we had envisioned six weeks ago when we started this project.

Our Itinerary

2025 Trips

Buenos Aires, Argentina (Feb)
Bariloche, Argentina (Feb)
Iguazu Falls, Argentina (Feb)
Boston, MA (Apr)
Kathmandu, Nepal (May)
Bhutan (May)

2024 Trips

San Diego, CA (Jan)
Sarasota, FL (Feb)
Madrid, Spain (Mar)
Valencia, Spain (Mar+Apr)
Palma, Mallorca (Apr)
Croatia (May)
Long Island, NY (July)
Faroe Islands (Aug)
London, UK (Sept)
Puglia, Italy (Sept)
Matera, Italy (Oct)
Rome, Italy (Oct)
Mosel Valley, Germany (Oct)
Frankfurt, Germany (Oct)
London, UK (Dec)
Manchester, UK (Dec)

2022 Trips

Florida (Feb)
NC Mountains (Apr)
Washington DC (Apr)
Valencia, Spain (May)
Hilton Head, SC (May)
Pacific NW (Jun)
Long Island (Jul)
Florida (Sept)
Chicago (Sept)
Poland (Sept)
NC Mountains (Nov)
Euro Xmas Markets (Dec)